Case Studies Index

Capula is a specialist in advanced automation and real-time business intelligence, working in the nuclear, power generation, utilities, environmental, oil & gas and industrial markets.

Our core offerings are in consultation, automation, IT and support. As an independent system integrator, we have solutions renowned for innovation, project delivery, quality and safety.

Below is a sample of projects we've carried out across our markets.

 

At the end of March 2002, Bradwell Power Station located in Essex, reached the end of its design life and ceased generation... Read more >>
This was essentially a new build project of an Energy from Waste (EfW) plant commissioned by Greater Manchester Waste (GMW)... Read more >>
Oil and gas is a global market with challenges in economics, scale and safety, and directly reactive to supply and... Read more >>
Station services systems are the ancillary plant control systems, which control the plant that is common to all six generating units and includes... Read more >>
First half control systems were based upon various technologies from that age and mainly comprised conventional hard controls and indications... Read more >>
Following the first half refit in 1997, the main control room comprised three modern 'soft' operator desks based upon the APMS SCADA system... Read more >>
In 2008 Drax Power embarked on a major investment to build a facility to receive, handle, store, and process biomass fuels of various types. Fuel can be received by... Read more >>
Rutland Water is one of the largest artificial lakes in Europe and was constructed in 1976 to supply water to... Read more >>
Energy providers need to balance plant finely to maximise output while minimising emissions of sulphur dioxide (SO2)... Read more >>
In 2000, the European Parliament passed the ‘Landfill Directive’, a piece of legislation which set limits on the...... Read more >>
The FGD control systems had to integrate with the generating unit control systems at the power station to safely control... Read more >>
The maximum output of the Boiler Plant is 90,000Kg of steam per hour which is consumed by the distillery process plant... Read more >>
Each site uses numerous distributed control and SCADA systems and Huntsman Tioxide had a strategic aim to... Read more >>
Capula was awarded the turnkey contract for the implementation of the APMS scheme on Unit 2 at West Burton Power Station, then went on to... Read more >>
In line with the Government’s regulations for large combustion plant, Scottish Power decided to fit Flue Gas Desulphurisation... Read more >>
As one of the ten largest water facilities in the World, Yorkshire Water identified the need for high quality operational information to help it improve business performance... Read more >>
Nuclear

Search Case Studies

Looking for a specific project, client or technology? Search our news archives here...

Accreditations & Verifications

ISO 9001
ISO 90003
OHSAS 18001
ISO 14001
ISO 9001 (TickIT)
CASS IEC 61508
Registered for:
Capula on LinkedIn

Contact Us / Find Us

Westpoint House
Prospect Road
Arnhall Business Park
Westhill
Aberdeen AB32 6FE
Kinniside Suite
Innovation Centre
Westlakes Science & Technology Park
Whitehaven
Cumbria CA24 3TP
Orion House (HQ)
Stone Business Park
Stone
Staffordshire ST15 0LT
1414 Charlton Court
Gloucester Business Park
Gloucester GL3 4AE
Vulcan House
Calleva Park
Aldermaston
Reading RG7 8PA


Call our HQ on
+44 (0)1785 827000

E-mail us | View Locations