Defuelling Machine Refurbishment & Verification - Bradwell power station

Download PDF >>

Business Challenges

At the end of March 2002, Bradwell Power Station located in Essex, reached the end of its design life and ceased generation. Fuel is currently being removed from both reactors and then packaged for shipment from site to Sellafield, a routine process that will be
complete in 2005.

There are approximately 20,000 fuel elements per reactor and each one has to be removed individually. This represents a huge number of operations. It is essential that every one is removed from the reactor and the details of each carefully recorded. The existing equipment was not designed for a full defuelling process and the procedures currently used at Bradwell for tracking fuel elements is essentially a manual paperwork system which relies heavily on human intervention.

Magnox Electric relies on the defuelling equipment and associated processes in order to commit to a programme of safely removing,  tracking and shipping the fuel off site.
Therefore, BNFL Magnox decided to invest in a complete refurbishment of the defuelling machine plant control system at Bradwell (both electrical, instrumentation, and mechanical) to provide a modern and reliable system, and to install a computer based Verification System to monitor and record all defuelling operations.

The key aims of the project are:

  • To modernise the current control system and improve its reliability
  • To enable fuel elements to be removed with an overall potential for error of 10-4 or less
  • To modernise the operator interface and control room environment
  • To assist BNFL Magnox to meet their commitments for delivery of fuel to Sellafield
  • To enable accurate logging of all defuelling actions


How We Helped

As one would expect on a nuclear site, there are very stringent design standards in place on the project.  We are obliged to support BNFL Magnox in demonstrating to the Independent Nuclear Safety Assessor (INSA), that the Safety Case can be made for thework. The company’s PES guidelines for the design of programmable systems in safety related applications were used in the design.

The scope included:

  • A Control, Tracking and Verification solution based on Mitsubishi Q series hot standby PLC system with variable speed drive and remote I/O sub-systems, with a MX2000 based Scada system, and a Microsoft SQL Server based relational database system running on an industrial computer with RAID disks
  • A complete refurbishment of the control room including heating, ventilation and lighting
  • Designing and supplying a new operator desk, along with PLC cubicles, drive cubicles and various panels
  • Extensive field work. New resolvers and optical encoders for accurate measurement of machine positions, 9 new motors and a variable speed drive to give better speed control of the fuel element hoist were all installed
  • A number of fixed and flexible (umbilical) electrical cables were replaced. A number of manual control panels located out on the reactor pile cap area were installed
  • Mechanical refurbishment of a number of parts of the defuelling machinery, i.e. to replace seals, fit transducers, overall moving parts etc.

All site work was carried out in a radiation controlled area and co-ordinated by our site manager in conjunction with Magnox staff.

The resultant system provides increased automation of the process, gives better indication of the plant state and logs all events to a database system for historical storage.

The Verification system for Reactor 1 and 2 was successfully delivered to specification and on cost,whilst meeting all the design and safety criteria mandated on a project of this nature.

Nuclear

Search Case Studies

Looking for a specific project, client or technology? Search our news archives here...

Accreditations & Verifications

ISO 9001
ISO 90003
OHSAS 18001
ISO 14001
ISO 9001 (TickIT)
CASS IEC 61508
Registered for:
Capula on LinkedIn

Contact Us / Find Us

Westpoint House
Prospect Road
Arnhall Business Park
Westhill
Aberdeen AB32 6FE
Kinniside Suite
Innovation Centre
Westlakes Science & Technology Park
Whitehaven
Cumbria CA24 3TP
Orion House (HQ)
Stone Business Park
Stone
Staffordshire ST15 0LT
1414 Charlton Court
Gloucester Business Park
Gloucester GL3 4AE
Vulcan House
Calleva Park
Aldermaston
Reading RG7 8PA


Call our HQ on
+44 (0)1785 827000

E-mail us | View Locations

By continuing to use the site, you agree to the use of cookies. You can change this and find out more by following this link.