Capula supply control systems for waste treatment plants

19 May 2009

Lancashire is set to become one of the leading areas in Europe for environmentally friendly waste management, with a Capula control system at its heart.

Since the European Parliament passed the Landfill Directive in 2000, there is a set limit on the amount of biodegradable municipal waste that can be sent to landfill. Lancashire County Council, as part of a £2 billion waste contract also involving Blackpool Council and Global Renewables (the Manchester-based subsidiary of Australian engineering group GRD Limited), are creating two Mechanical Biological Treatment plants in Leyland and Thornton.

Waste will be sorted using an innovative mechanical and biological treatment process that recovers recyclable materials such as paper, metal, glass and plastic. It then transforms the organic portions of the waste into renewable energy and a high quality compost product, suitable for woodland or energy crop planting, together with land reclamation and remediation.

Working in conjunction with Waste 2 Resources, a joint venture between GRD Minproc and Bovis Lend Lease Technologies), the Capula control system will control the entire plant from sorting waste to energy production.

“Capula's vast experience with complex process control applications and power generation plants will aid considerably within the design stage of the process, as timescales are tight,” said Chief Executive Roger Turner, “ However Capula has a good reputation for delivering high quality automation solutions on both new build and refurbishment projects in the energy, utility and waste management industries in the UK where tight project timescales are the norm.
“We are very proud of our excellent track record for delivery to programme.”

If you would like further information, please email our Business Development Team: sales@capula.co.uk

Share:

Nuclear

Search News

Looking for a specific project, client or technology? Search our news archives here...
Nuclear

Related Articles

Would you like to read other stories that are similar to this?
Click on of the tags below for a list of relevant articles.

Accreditations & Verifications

ISO 9001
ISO 90003
OHSAS 18001
ISO 14001
ISO 9001 (TickIT)
CASS IEC 61508
Registered for:
Capula on LinkedIn

Contact Us / Find Us

Westpoint House
Prospect Road
Arnhall Business Park
Westhill
Aberdeen AB32 6FE
Kinniside Suite
Innovation Centre
Westlakes Science & Technology Park
Whitehaven
Cumbria CA24 3TP
Orion House (HQ)
Stone Business Park
Stone
Staffordshire ST15 0LT
1414 Charlton Court
Gloucester Business Park
Gloucester GL3 4AE
Vulcan House
Calleva Park
Aldermaston
Reading RG7 8PA


Call our HQ on
+44 (0)1785 827000

E-mail us | View Locations